News
Bradwell Decommissioning
Project Information
Fuel Element Debris (FED) dissolution at the station following shutdown in March 2002 after 40 years of operation.
Equipment
An extensive process control instrumentation package incorporating Pressure & Temperature Transmitters, Magnetic & Coriolis Flowmeters, Hydrogen & Redox Analysers, Ultrasonic Level Transmitters.
Details
The accelerated decommissioning programme saw the reactor become the first in the UK to enter Care & Maintenance (C & M) in 2015. Equipment deployed in “Red” areas of high radiation fields required the nuclear industry’s specific safety benchmark, Emphasis Approval