Southern Water And Success On Brighton Seafront

In order to comply with bathing water directives Southern Water has recently built an offline storage tank at Brighton. This facility has been constructed to intercept post-storm discharges from the sewer system and contain them until such time as the sewerage system can effectively process them. The system has been designed to contain the volumes of stormwater generated by a storm intensity, which occurs once in every 50 years.

Digesting The Needs Of The Environment

Mogden Sewage Treatment Works is one of five in the London area being upgraded by Thames Water, to ensure the stricter treatment standards to be introduced by its regulator, the Environment Agency, in 2013 are met.